Kang-Ting Ma
Department of Business Administration and Graduate Institute of Logistics Management, National Dong Hwa University, Hualien 974301, Taiwan

Ch2 Productivity
Zelenyuk, V. (2023). Productivity analysis: roots, foundations, trends and perspectives. J Prod Anal60, 229–247.
https://doi.org/10.1007/s11123-023-00692-1
Ch17 Project management
(專案風險與機會評估中的不確定性映射)
Qazi, A., Dikmen, I., & Birgonul, M. T. (2019). Mapping Uncertainty for Risk and Opportunity Assessment in Projects. Engineering Management Journal, 32(2), 86–97.
https://doi.org/10.1080/10429247.2019.1664249
Ch3 Forecast
Schaffer, A., Dobbins, T., & Pearson, S. (2021). Interrupted time series analysis using autoregressive integrated moving average (ARIMA) models: a guide for evaluating large-scale health interventions. BMC Medical Research Methodology, 21.
https://doi.org/10.1186/s12874-021-01235-8.
Ch11 Master Scheduling
F. Ning, Y. Jin, P. Zhang and X. Yang, Research on Master Production Schedule Optimization of Fast-Moving Consumer Goods Companies Based on the APO-NSAGA Algorithm, Rev. int. métodos numér. cálc. diseño ing. (2025). Vol. 41, (1), 7 URL https://www.scipedia.com/public/Ning_et_al_2025a
Ch12 Inventory Management: EOQ
Cenk Çalışkan (2021) A simple derivation of the optimal solution for the EOQ model for deteriorating items with planned backorders, Applied Mathematical Modelling, Volume 89, Part 2, Pages 1373-1381,
https://doi.org/10.1016/j.apm.2020.08.037.
Ch12 Inventory Management: Newsboy Vendor
Zhongfeng Qin, Samarjit Kar (2013) Single-period inventory problem under uncertain environment(單期存貨問題在不確定環境下), Applied Mathematics and Computation,Volume 219, Issue 18, Pages 9630-9638, https://doi.org/10.1016/j.amc.2013.02.015.
Ch13 Lean Production and JIT
Filho, M., Ganga, G., & Gunasekaran, A. (2016). Lean manufacturing in Brazilian small and medium enterprises: implementation and effect on performance. International Journal of Production Research, 54, 7523 - 7545. https://doi.org/10.1080/00207543.2016.1201606.